Alex Prior
t. +34 661 759 171
alex.prior@cbre.com
Carlos Rodriguez
t. +34 610 417 352
c.rodriguez@forcadell.com
Albert Fernández
t. +34 639 69 17 17
t. +34 93 574 40 10
a.fernandez@simer.es
Building located in the municipality of Les Franqueses del Vallès, in the Pla de Llerona industrial estate. Built to the highest quality standards and complying with the most demanding sustainability criteria. Plot of 2,364 m², consisting of a warehouse with 1,493 m² built, 1,232 m² on the main floor. The main warehouse is divided into two sectors of 775 m² and 252 m² for racking, two loading docks, yard area and cross-dock of 112 m², and 261 m² built on the first floor for offices. Capacity for up to 1,668 pallets in logistics use. High risk level 8 for logistics use.
Tipe: Deck
Membrane: TPO 1,8 mm – FM Approved
Insulation: 100 mm rock wool – Hardrock 391
Sheet metal: Profile 48, 0.7 mm
Walls: 20 cm lightweight – 6+8+6
Flatness: FF = 50 | FL = 40
Thickness: 20 cm
Flooring: AC 5 laminate
Joinery: Aluminium frame with thermal break
Suspended ceiling: Accessible mineral fibre panels
HVAC: Air-based heating and cooling
Installed lift
1 accessible parking space
1 adapted toilet on the ground floor
1 adapted toilet on the office area
Changing rooms with showers for staff
Complete perimeter fencing
Anti-intrusion alarm system