Alex Prior
t. +34 661 75 91 71
alex.prior@cbre.com
Albert Fernández
t. +34 639 69 17 17
t. +34 93 574 40 10
a.fernandez@simer.es
Carlos Rodriguez
t. +34 610 41 73 52
c.rodriguez@forcadell.com
The building is strategically located in the municipality of Santa Perpètua de Mogoda, within the Can Vinyalets industrial estate, at exit 18 of the AP-7 highway. Its prominent facade offers exceptional visibility from the highway, enhancing its commercial appeal. Constructed to the highest quality standards, the facility complies with the most rigorous sustainability criteria. The plot spans 3,619 m² and includes a 2,624 m² built warehouse: 1,919 m² on the main floor and 704 m² of office space, distributed across two floors of 350 m² each. The frontage spans 500 m², providing outstanding visibility from the AP-7 and offering the potential for a large advertising banner. The warehouse accommodates up to 2,970 pallets in aisles, utilizing a Class 300A forklift for logistical operations. The warehouse area includes a central partition to accommodate high fire risk, in compliance with Spanish regulations.
Type: Deck
Sheet: TPO 1.8 mm – FM Approved
Isolation: 100 mm rock wool – Hardrock 391
Sheet: Profile 48 of 0.7 mm
Enclosures: 20 cm reinforced – 6+8+6
Floor plan: FF = 50 | FL = 40
Thickness: 20 cm
Flooring: Floating access floor
Joinery: Aluminum frame with thermal break
Suspended ceiling: Modular microperforated metal panels
Climate control: Air heating and air cooling
Lift installed
1 accessible parking space
1 accessible bathroom on the ground floor
1 accessible bathroom in the office area
Changing rooms with showers for warehouse personnel
Fence: Complete perimeter
Alarm: Anti-intrusion system